Checking items |
Requirements of criterion |
Checking results |
conclusion |
¢ñ. Material |
1. Steel tube and steel strip |
Parent tube£ºsteel tube ND-¦Õ32¡Á3-GB/3087 |
Satisfactory |
Accepted |
Steel strip 08Al £º16.2¡Á1.2 16.2¡Á1.0¡¡ |
Satisfactory |
Accepted |
Certification of material quality |
Effective |
Accepted |
2. Welding surface of parent tube and steel strip |
No flaws and impurity that influence the quality of welding such as coverage, iron rust and recess. |
Satisfactory |
Accepted |
¢ò.Braze welding of thermotube fin |
1. Jointing of the starting point and the ending point of the fin |
Fix with the manual welding method |
Satisfactory |
Accepted |
2. rate of fin deposition |
100% |
Satisfactory |
Accepted |
3. Quality of no fin part |
The flaw such as recess and under cut which is more than the negative deviation of the thickness of parent tube wall should be smoothed |
Satisfactory |
Accepted |
¢ó. Deviation of thermotube configuration sizes |
1.Total length |
5075¡À5 |
5070¡À5 |
Accepted |
2. Height requirements of fin |
15 |
15¡À0.5 |
Accepted |
3. Deviation of fin thread pitch |
0.5/10 |
0.5/10 |
Accepted |
4. Thermotube linearity |
¡Ü1.5mm/m |
¡Ü1.5mm/m |
Accepted |
5.Rake angle of fin tube |
¡Ü8¡ã |
¡Ü8¡ã |
Accepted |
6.End plate of thermotube |
Be round off and no gas cavity and crack on the end plate |
Satisfactory |
Accepted |
7. Diameter of weld point on top of end plate |
¡Ý8mm |
¡Ý8mm |
Accepted |
8. Height of weld point on top of end plate |
¡Ý3mm |
¡Ý3mm |
Accepted |
9. Welding position of caulking ring and tube body |
The distance of the welding position and the heating section 2800¡À5¡£ |
2800¡À5 |
Accepted |
10. Welding height of caulking ring and tube body |
¡Ý4mm |
¡Ý4mm |
Accepted |
11. Welding quality of caulking ring and tube body |
No flaws such as gas cavity, crack and cinder inclusion. |
Satisfactory |
Accepted |
¢ô. Performance of the thermotube |
1.Listening check |
Each product should be check after being finished. Shake the thermotube and the silvery voice should be heard. |
Satisfactory |
Accepted |
2.Starting time |
¡Ý5min |
¡Ý5min |
Accepted |
3.Isothermal performance |
The temperature difference of cooling section¡Ü5¡æ |
¡Ü5¡æ |
Accepted |
Checker£º Checking engineer£º Date£º2005/4/24 |