1. 范围 Scope
1.1 文档概述 Summarization of the document
本文档依据《HYH验证与确认计划》中的要求,根据《SRS.多OPS切换需求规格说明书审查计划》进行审查并编写。本文档对《SRS.Switching between multi-ops Requirements for HongYanHe Project》PRE版审查工作的验证过程和审查结论进行文档化。
The document is examined and compiled based on HYH verification and confirmation plan and SRS. multi-OPS switch requirements specification examination plan. the document documented the verification process and examination result of examination of SRS.Switching between multi-ops Requirements for HongYanHe Project PRE version.
华译网北京翻译公司翻译过大量有关文档概述的文件资料。
Beijing Mandarin Chinese Translation Service Company has translated many technical documents in the field of Summarization of the document.
本文档从规范、标准、技术三方面对《SRS.Switching between multi-ops Requirements for HongYanHe Project》PRE版进行验证,并对审查验证结果进行分析、小结,提出相应的改进建议。
The document is verified 《SRS.Switching between multi-ops Requirements for HongYanHe Project》PRE version on standard, regulation, technology aspect, and analyzed & summarized the examination result with relevant improvement advice.
本文档是软件需求阶段开展文档审查工作的成果。
The document is the achievement of document examination at software requirements phase.
1.2 文档缩略语 Document abbreviation
OWP—operating work place
2. 引用文档 Referenced documents
[1]《SRS.Switching between multi-ops Requirements for HongYanHe Project》 PRE版。 SRS.Switching between multi-ops Requirements for HongYanHe Project PRE version.
[2] 红沿河仪控系统招标文件 “Detail technique requirement specification about Control room and MMI ” 来自 CNPEC 2006年9月30日。Bidding document of instrument control system of HongHeYan “Detail technique requirement specification about Control room and MMI ” from CNPEC 2006-Sept.-30.
[3]《需求同行评审指南B》。examination guide B on current requirements.
[4]《SRS.多OPS切换需求规格说明书审查计划》。SRS. examination plan of specification on multi-OPS switch requirements.
[5]《SRS.QC审查记录表-多OPS切换需求规格说明书》。 SRS.QC examination record-multi-OPS switch requirements specification.