Beijing and Shanghai Chinese Translation Service in The field of LongHua hub of water resources and hydropower engineering general situation of the project

1 Comprehensive Introduction
1.1 General Conditions
1.1.1 General Description of the Project
Hebei Luanhe Longhua Key Hydraulic and Hydropower Project (Abbreviated as “Longhua Key Hydraulic and Hydropower Project”) lies on the main stream of Luanhe River in Longhua County, Chengde, which is situated in the northern part of Hebei province. The overall project is composed of two minor projects: Xiaoduishan Reservoir and Xiwan Hydropower Station. The reservoir covers a controlled basin area of 14 742km2, taking up 33 percent of total Luanhe basin area. Xiaoduishan Reservoir is a medium-sized hydraulic project, which concentrates on water supply and flood control. Its total storage capacity is 24,62 million m3 and the dam belongs to the type of roller compacted concrete gravity dam. The highest point of the dam is 45 m. Xiwan Hydropower Station, a hybrid hydropower station, has the pressure tunnel as long as 6.68 km. It is equipped with two hydro-generator units, with total capacity 2×1,6000 kw. The maximum liquid head is 81m and the annual average generated energy is 63.19 million kWh (where the peak loads are 50.995 million kWh,and normal loads 12.195 million kWh). The estimated total project investment is 0.22996 billion RMB. The total construction period lasts three years, and the project scale is Ⅲ. The flood design standard for the reservoir is once every 50 years, and check flood standard is once every 500 years. The corresponding standards for the workshop are every 30 years and every 100 years.

Beijing   Mandarin Chinese Translation Service Company has translated many technical documents in the field of LongHua hub of water resources and hydropower engineering general situation of the project.
华译网北京翻译公司翻译过大量有关隆化水利水电枢纽工程的工程概况文件资料。

1 综合说明
1.1 概述
1.1.1 工程概况
       河北省滦河隆化水利水电枢纽工程(以下简称“隆化水利水电枢纽工程”)位于河北省北部承德市隆化县境内的滦河干流上,由小对山水库和西湾水电站两部分工程组成。水库控制流域面积14742km2,占滦河流域总面积的33%。小对山水库是以供水、防洪为主的中型水利工程,总库容2462万m3,拦河坝为碾压混凝土重力坝,最大坝高45m;西湾水电站为混合式电站,压力隧洞长6.68km,电站装机两台,总容量2×1.6万kW。最大水头81m,年均发电6319万kW?h(其中峰荷电5099.5万kW?h,常电1219.5万kW?h)。估算工程总投资22996万元,施工总工期3年。工程等别为Ⅲ等,水库设计洪水标准为50年一遇,校核洪水标准为500年一遇;电站厂房设计洪水标准为30年一遇,校核洪水标准为100年一遇。