• 1 647 624 9243
  • bjctn@hotmail.com

Translation Resources

Beijing and Shanghai Chinese Translation Service in The field of Capability test of the system



8.1.3  Capability test of the system
8.1.3.1 Test tools
MI(Mercury Interactive)Corporation’s Load Runner 8.0; Establish virtual user’s script tool Virtual User Generator; Run practice scene tool Controller and Analyze test result tool Analysis. Capability monitor(inside Microsoft Win2000).

8.1.3.2 capability test of the respond time
Analyze the test result base on the test circumstance.

Beijing Mandarin Chinese Translation Service Company has translated many technical documents in the field of Capability test of the system.

8.1.3.3 capability test of the CPU and Memory
Test the capability of the Client, Server and Database Server’s CPU and Memory, and Analyze the test results.

8.1.3.4 capability test of the load(pressure test)

8.1.3.5 capability test of the reliability

8.1.3.6 Capability test of the network
Test the capability of the network, such as network’s rate of flow, hits per second, network delay.

8.1.3.8 The rule of the test complete
The system satisfy various capability demand, meet reality use and offer test report.

8.1.3.9 Document and report submitted
System test example, system capability test plan, system capability test report, system capability test script.