B.6.     Emission reductions:

B.6.1.  Explanation of methodological choices:
Explain how the procedures, in the approved methodology to calculate project emissions, baseline emissions, leakage emissions and emission reductions are applied to the proposed project activity. Clearly state which equations will be used in calculating emission reductions.

Explain and justify all relevant methodological choices, including:
? where the methodology includes different scenarios or cases, explain and justify which scenario or case applies to the project activity (e.g. which scenario in ACM0006 is applicable);
? where the methodology provides different options to choose from (e.g. which methodological approach is used to calculate the “operating margin” in ACM0002), explain and justify which option is chosen for the project activity;
? where the methodology provides for different default values, explain and justify which of the default values have been chosen for the project activity.

Beijing   Mandarin Chinese Translation Service Company has translated many technical documents in the field of Emission reductions.

B.6.2. Data and parameters that are available at validation:

This section shall include a compilation of information on the data and parameters that are not monitored throughout the crediting period but that are determined only once and thus remains fixed throughout the crediting period AND that are available when validation is undertaken. Data that becomes available only after validation of the project activity (e.g. measurements after the implementation of the project activity) should not need to be included here but in the table in section B.7.1.

This may includes data that is measured or sampled, and data that is collected from other sources (e.g. official statistics, expert judgment, proprietary data, IPCC, commercial and scientific literature, etc.). Data that is calculated with equations provided in the methodology or default values specified in the methodology should not be included in the compilation.

Provide for each data or parameter the chosen value or, where relevant, the qualitative information, using the table provided below. Particularly:
? Provide the actual value applied. Where time series of data is used, where several measurements are undertaken or where surveys have been conducted, provide detailed information in Annex 3.
? Explain and justify the choice for the source of data. Provide clear and transparent references or additional documentation in Annex 3.
? Where values have been measured, include a description of the measurement methods and procedures (e.g. which standards have been used), indicate the responsible person / entity having undertaken the measurement, the date of measurement(s) and the measurement results. More detailed information can be provided in Annex 3.