Bidding Document of Water Supplying Pump Unit Equipment
Volume One Instructions for Bidding
Tenderee : YYYYY Power Company LTD.
Procurement agent : XXXXX Equipment CO., LTD.
March 2008
Content
Volume One Instructions for Bidding 1
1. Definition 1
2. Project Progress and Outline 1
3. Bid Scope 2
4. Qualification and Achievement Requirements for the Tenderer 2
5. Bidding Documents 3
6. Tender document 4
7. Bid Opening 10
8. Tender evaluation 10
9. Calibration 13
10. Award of Contract 13
11. Disciplines and confidentiality 14
12. Cost of Bidding 15
Frontal Attached List
Item Compiling Contents
1 Name of the project: 2×1250MWe Grade Nuclear Power Unit in the First Phase of ZZZZZZ Nuclear Power Plant
Place of construction: XXXXX Village, XXXXX City, Shandong Province
Bid scope: water supplying pump unit equipment, see detail in technical section of the bidding document.
Procurement mode: bidding procurement
Tenderee: YYYYY Power Company LTD.
Address: Site of XXXXX Nuclear Power Plant, Liugezhuang Town, XXXXX City, Shandong Province Postcode: 265100
Linkman:
Tel: 0535-
Fax:0535-
EMAIL:
Procurement agency: XXXXX Equipment CO., LTD.
Address: No.15, North Street of XXXXX, Dongcheng District, Beijing Postcode: 100011
Linkman:
Tel: 010-
Fax: 010-
EMAIL:
2 Name of the contract: Procurement of Water Supplying Pump Unit Equipment for 2×1250MWe Grade Nuclear Power Unit in the First Phase of ZZZZZZ Nuclear Power Plant
3 Source of funds: 20% of the investment will be provided by shareholder, and the other 80% will be bank loan.
4 Qualification of tenderer: see detail in the bidding document
5 Bidding scope: must cover all supply scopes required in the bidding document.
6 Contract payment mode: fixed price.
7 Bid currencies: domestic tenderer: RMB
Foreign tenderer: US dollar
8 Site investigation: The tenderee will not organize the on-site investigation, and tenderers can do that by themselves.
9 Clarification of bidding document: tenderer must send all problems which need to be clarified or explained to the procurement agency by fax and email (in word form) before March 20, 2008. Tenderee will not explain for clarifications later than that time.
10 Bid validity: 180d after the specified time limit for submission of the tender document.